Migration Workflows

Prev Next
  • Published on Apr 21, 2026
Prepare and Import into the Reveal Project Compress and Transfer Data to Reveal Stage the data to the Z Drive Download the data on the Load Machine. Copy and unzip the data to the root of the Z:\ drive on the Load Machine. Refer ...
  • Published on Apr 21, 2026
Exporting your data The migration process begins by exporting your data from Review. The goal of this process is to prepare your archive for easy upload into Logikcull and preserve any existing work product. Work product such as tags, notes, commen...
  • Published on Apr 21, 2026
Once you have exported your data from Open Discovery, Local Discovery or Reveal, there are two parts to the Logikcull import process: Importing your data to Logikcull. Quality checking your upload. Importing Data Into Logikcull Once you’...
  • Published on Apr 21, 2026
Introduction Logikcull projects can be fully exported by downloading all the documents in your project along with all available metadata. This guide provides step-by-step instructions on how to achieve this, whether you require all records, inclu...
  • Published on Apr 21, 2026
Important There are some case elements that do not transfer from the Local Discovery case. These include: Custom Layouts Saved Searches Control/Pick Lists Case Documents Production Shield Production Settings Partial Dates – ...
  • Published on Apr 21, 2026
Important There are some case elements that do not transfer from the Open Discovery case. These include: Custom Layouts Saved Searches Control/Pick Lists Case Documents Production Shield Production Settings Partial Dates – ...
Footer Design