Production
- 13 Articles
- Updated on Aug 6, 2025
- Published on Nov 19, 2024
Overview After receiving a Request for Production, responsive documents will first need to be isolated into their own Production Set through a Work Folder by performing the following three steps: Retrieve all documents coded responsive that w...
- Updated on Apr 22, 2026
- Published on Nov 19, 2024
To create a new production, place the documents to be produced in Public or Private Work Folder(s) under the Folder View of any of the Dashboard screens. You will then reference the Work Folder(s) when you add a Production Job, described below. ...
- Updated on Oct 26, 2026
- Published on Nov 19, 2024
When a Production Job is created, running the Preproduction function allows you to gain information about the job, such as total documents and pages. Most importantly, it can draw attention to any documents that may error during production. This is ...
- Updated on Oct 26, 2026
- Published on Nov 19, 2024
Before a Production Job appears as a selectable option in the Production Export Setup modal, it needs to run through Full Processing. Start Full Processing From the Production Jobs table, click the Status dropdown . Choose Start Full P...
- Updated on Oct 1, 2026
- Published on Nov 19, 2024
Produced documents are exported with associated load files using the Production Export function. Note See Blackout Redactions – Production Settings for instructions on how to produce spreadsheets redacted through Blackout. Log in to Rev...
- Published on Aug 26, 2025
After you create a Production Export Job , it will appear in the Production Export table with a Created status. You can manage your Production Export Jobs from this table, as well as perform preprocessing actions via the dropdown underneath the s...
- Updated on Oct 26, 2026
- Published on Aug 26, 2025
How to Use This Document The settings provided below are the minimum settings needed to export redacted Blackout natives and text files. For mixed productions (redacted Blackout + other file types), you may fill out any of the additional settings...
- Updated on Oct 23, 2026
- Published on Nov 19, 2024
Database Update can be used to add a production’s images and/or a production’s Bates numbers to the database. Log in to Reveal as an Administrator or Client Administrator. Open the project from the Project Hub. Click Admin and open ...
- Published on Nov 19, 2024
This document outlines the various parts of the new Advanced Numbering job. This is a feature that has been developed for the Australian market to simplify the process of supporting the Australian production numbering protocol without having to push...
- Updated on Jul 8, 2025
- Published on Nov 19, 2024
An Image Set is a collection of images which may be populated for the entire project dataset ( e.g. , Default ), a specific subset ( e.g., CJK Documents or Architectural drawings ) or a production. There may be images from multiple image sets ass...
- Updated on Aug 15, 2025
- Published on Nov 19, 2024
The Templates tab, found under Project Admin, allows for the creation and management of templates for various aspects of the Review project interface. Templates saved here are available for use within the project. Use of this tool requires that the ...
- Published on Mar 21, 2025
Introduction The time zone handling in imaging has been significantly updated to improve accuracy and efficiency in document processing. The recent changes in how the system processes time zone offsets for images and documents in production, implem...